Everhour adds resource planning to Asana work, turning tracked task time into capacity, availability, and planned-versus-actual views.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
This page is for checking whether the work assigned across Asana projects fits the team that will do it. The practical job is to see who has room, who is overloaded, and which project needs a staffing or deadline change. Task ownership and status stay in Asana, while utilization depends on planned hours, logged time, weekly capacity, time off, and project context.
A useful utilization view does not treat every person as available for the same number of hours. Full-time, part-time, and custom weekly capacity change the denominator. Scheduled vacations, sick days, and holidays also reduce available time. The result should tell you whether a person has enough capacity for the planned work, not just whether their task list looks busy.
Start with the work structure: project, task, assignee, estimate, planned period, and owner. Then add the time layer: tracked actual hours, remaining work, and whether the hours belong to client work, internal work, or non-billable support. A person assigned 32 planned hours in a 40-hour week is at 80% planned utilization before time off or meetings enter the schedule.
Tracked time makes the review defensible. A timer or manual entry tied to the Asana task shows where the hours landed. Project and task names, custom fields, and tags should stay synced into the reporting layer, so the same work breakdown appears in utilization reports, budget views, and project summaries. That structure lets managers compare planned load with actual work without rebuilding the week in a spreadsheet.
A full task list does not prove full utilization. Small tasks, blocked tasks, and unestimated work distort the view unless planned hours and tracked hours are reviewed together. The common mistake is counting assignments instead of capacity. Ten assigned tasks can equal 6 hours or 45 hours depending on estimates, scope, and who owns the follow-up work.
Another mistake is ignoring time off and partial capacity. A person with 24 weekly capacity and 6 hours of scheduled absence has 18 available hours for project work that week. Assigning 24 planned hours makes the schedule look reasonable only if the utilization view ignores absence. Treat capacity as a dated planning input, then compare it with tracked reality after the week closes.
A one-off check is enough when you need a quick view of one project, one week, or one overloaded person. List assignments, compare planned hours with capacity, and adjust the schedule. That works for a small team when the same manager owns planning, follow-up, and client communication.
A managed workflow becomes necessary when utilization affects budgets, billing, payroll review, or hiring decisions. Everhour Resource Planning adds visual timelines, member and project views, weekly capacity, availability gaps, scheduled time off, and planned-versus-actual comparisons on top of Asana work. That turns utilization from a manual status check into a repeatable planning process with tracked time behind it.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Utilization compares planned or tracked project hours with a person's available capacity for the same period. Use the person's actual weekly capacity, then subtract scheduled time off before judging the workload. A 30-hour assignment against 40 hours of capacity is different from 30 hours against 32 hours of capacity with a vacation day.
Count tasks that represent real assigned work and have an owner, estimate, or tracked time entry. Exclude placeholder tasks, blocked items with no active work, and administrative notes unless someone actually spends time on them. The utilization view should reflect work demand on people, not every item visible in a project.
Review planned utilization before the workweek starts and actual utilization after time entries are submitted. The first review prevents overload before it happens. The second review shows whether estimates matched reality, whether time moved to different projects, and whether future capacity plans need correction.
The biggest mistake is mixing planned work, tracked work, and availability without separating them. Planned assignments show intended load. Tracked hours show what happened. Availability shows how much work the person could take on. A reliable report keeps those three values distinct, then compares them.
Yes, include non-billable work when the question is capacity. Non-billable meetings, internal fixes, and support work still consume hours. Separate billable and non-billable work when reviewing profitability or client billing, but keep both in the utilization view if the goal is to understand workload.
Everhour Resource Planning uses visual timelines, member and project views, weekly capacity, availability gaps, scheduled time off, and planned-versus-actual comparisons. Managers can review who is overallocated, who has room for more work, and how tracked time compares with the plan.
Everhour embeds tracking controls inside Asana and syncs project and task details into reporting. Time logged against Asana tasks flows into reports with project, task, member, custom field, and tag context, so utilization reviews use the same work structure the team already follows.
Track approved hours, capacity, and availability in Everhour so Asana project work becomes a practical utilization view with planned-versus-actual control.
14-day free trial · No credit card · Cancel anytime