Everhour adds team management controls to Asana workflows so scheduled work, tracked hours, and approvals stay aligned.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Asana team scheduling is for managers who need to assign project work without overloading people or losing the time record later. The useful schedule ties each person to specific Asana tasks or projects, a date range, and planned hours. A clean schedule also accounts for weekly capacity, current assignments, time off, and work already logged.
The practical output is a work plan your team can follow during the week. A designer assigned 12 hours on a campaign project, 6 hours on revisions, and 4 hours on internal work needs those blocks visible against capacity before the week starts. The same structure helps managers review tracked time after the work is done.
Start with each person's weekly capacity, then subtract known time off and standing commitments. After that, assign project or task work in blocks that match the person's role and availability. A full-time employee and a part-time contractor should not receive the same weekly load unless their capacity settings support it.
Good scheduling also separates planned work from tracked work. Planned hours show what should happen. Tracked hours show what actually happened. Comparing the two highlights slipped estimates, overloaded teammates, and projects that consume more capacity than expected. Managers get the clearest signal when every assignment has a person, project, period, and expected hour total.
A schedule loses value when it shows assignments but ignores approvals, corrections, and tracking limits. Team members need a clear rule for logging time against the Asana task or project they worked on. Managers need a review step before the time feeds billing, payroll review, or project reporting.
Common cleanup starts with vague blocks such as "client work" or "admin." Use the real project or task whenever possible, and keep internal work separate from client work. For team scheduling, the mistake is treating capacity as a calendar problem only. The record also needs clean roles, project assignments, approval status, and locked periods after review.
A one-off schedule works for a single project launch, a short staffing check, or a quick weekly planning session. It is enough when the team needs to see who can take the next task and no downstream billing, payroll review, or budget reporting depends on the result.
A managed workflow becomes necessary when scheduled work must become approved time. Everhour supports that shift with weekly capacity, project assignments, team groups, tracking limits, approval workflow, lock rules, and admin time correction. The team keeps Asana as the place for tasks and status while Everhour maintains the time policy and review layer.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Managers should start with each person's weekly capacity, then assign project or task work by role, date range, and expected hours. The schedule should leave room for time off, recurring internal work, and active commitments. After work starts, tracked hours should be reviewed against the planned load so future schedules reflect actual effort.
People-first scheduling works best for capacity planning because it shows who has room for more work. Task-first scheduling works best when deadlines drive assignments. Project-first scheduling works best for retainers or client budgets. A practical workflow uses all three views: person for capacity, task for execution, and project for reporting.
The biggest cleanup comes from assigning work without a matching time record. A manager can see who was supposed to work, but cannot confirm hours, billing status, or approval status later. Every scheduled block should connect to a project or task where the person can log time with enough detail for review.
A team schedule should be reviewed before the workweek starts and again before time is approved. The first review catches overloads and missing assignments. The second review checks whether logged hours match the work plan closely enough for reporting, billing, or payroll review.
Team scheduling should include approved time off because unavailable capacity changes the real workload for everyone else. A schedule that ignores vacations, sick days, or holidays overstates available hours and pushes work into overtime, missed deadlines, or last-minute reassignment.
Everhour Team Management lets admins set weekly capacity, project assignments, team groups, tracking limits, approval workflow, lock rules, and admin time corrections. Those controls keep Asana task work connected to a reviewable time record before hours move into reports, billing, or payroll review.
Everhour Reporting turns logged time, project data, and team details into reports with grouping, filters, date ranges, and export options. Managers can review hours by project, member, task, or other synced Asana context and share the results without rebuilding the schedule in a spreadsheet.
Use Everhour Team Management to turn assigned Asana work into approved, locked, and report-ready time records, with capacity rules that keep team schedules grounded in actual availability.
14-day free trial · No credit card · Cancel anytime