Everhour adds capacity reporting to Asana project work, so planned assignments and tracked hours stay connected.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
An Asana capacity report helps you compare assigned project work, planned hours, tracked time, and available capacity by person. The practical outcome is a staffing view that shows who is overloaded, who has room for more work, and where project demand exceeds the time available in the week.
Start with the work already organized in Asana: projects, tasks, assignees, tags, and custom fields. Everhour adds the time layer around that work, with embedded tracking controls in Asana and automatic sync of project names, task titles, custom fields, and tags for reporting.
A capacity report needs member, project, task, date range, planned time, tracked time, time off, and remaining availability. Weekly capacity matters because a 30-hour part-time schedule and a 40-hour full-time schedule should not be treated as equal supply. Reports should show both person-level totals and project-level demand.
Useful grouping depends on the decision you need to make. Group by member to spot overallocated people, by project to see staffing pressure, or by client when multiple projects draw from the same team. Exports help when finance, operations, or account leads need the same numbers outside the reporting workspace.
Capacity reports fail when planned assignments stay separate from actual logged work. A schedule can look balanced on Monday and still break by Thursday if urgent tasks consume time from another project. The report should compare planned capacity with tracked time, then show the gap while managers can still reassign work.
Time off also belongs in the capacity view. Vacations, sick days, and holidays reduce availability before project work enters the schedule. A clean report treats absence as unavailable capacity, then compares the remaining weekly capacity with planned task or project assignments.
A quick capacity check works for one project, one staffing meeting, or a short delivery window. It gives you a snapshot of workload by person and helps confirm whether the current plan fits the week. That is enough when the team is small and the schedule changes rarely.
A managed workflow becomes necessary when staffing, budgets, billing, and approvals all rely on the same hours. Everhour connects Asana task work with reporting, budget visibility, approved timesheets, locked periods, and exports, so capacity reviews use current tracked time instead of a manually rebuilt spreadsheet.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
An Asana capacity report should show each team member, assigned project work, planned hours, tracked hours, time off, and remaining availability for the selected period. Managers use those fields to compare workload against weekly capacity and decide whether to move tasks, adjust deadlines, or add support.
Review capacity by person when the decision is staffing, workload balance, or burnout risk. Review it by project when the decision is delivery risk, client commitment, or budget pressure. A useful report lets managers switch grouping without changing the underlying tracked time.
The fastest mistake is treating assigned tasks as available work capacity without checking actual logged time and time off. A person can own many tasks, but that does not prove the week has enough hours. Capacity reporting needs planned load, tracked work, and absence in the same review.
Capacity reports should include both billable and non-billable work when the goal is staffing. Non-billable meetings, internal work, and support tasks still consume available hours. Billing views can filter billable work later, but capacity planning needs the full workload picture.
Managers should review capacity at least weekly for active project teams. A weekly view catches overload before it becomes missed delivery, while a longer range helps plan future availability. Teams with changing priorities should also check capacity after major scope changes or staffing shifts.
Everhour Reporting builds capacity views from logged time, project data, budgets, costs, and team fields. Managers can use 45+ report columns, grouping, filters, date ranges, exports, and scheduled email delivery to review Asana project workload without rebuilding the report manually.
Everhour syncs Asana project and task context into reporting, including project names, task titles, custom fields, and tags. That keeps tracked time connected to the same work structure the team uses in Asana, so capacity reports can be grouped by the fields managers already recognize.
Track approved hours, planned workload, and reporting exports from Asana projects in Everhour, then use current capacity data to make staffing and delivery decisions with Everhour Reporting.
14-day free trial · No credit card · Cancel anytime