Construction project costs move with labor, scope, and change work. Everhour adds cost tracking and reporting around Asana projects.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Use this page to organize construction project costs around the work already assigned in Asana. A project manager, bookkeeper, or owner needs more than a total hour count. The useful record shows which task the time belongs to, who logged it, whether it is billable, and which phase or cost category should absorb the labor cost.
For construction work, the task structure matters. Separate site prep, framing, electrical, punch list, change work, and closeout tasks instead of dropping all time into one project bucket. That structure lets a weekly cost review show where labor is moving the budget, which work should be billed to a client, and which internal work should stay out of the invoice.
A construction cost workflow turns time into money by combining logged hours with rates. Keep cost rates separate from client-facing billable rates when payroll cost, invoice amount, and margin need different numbers. Mark work as billable only when the contract, change order, or service agreement supports billing that time to the client.
A useful line item reads like a job record: `Electrical rough-in, 6 hours, apprentice rate, billable, change order 014`. That entry gives accounting enough context to invoice, gives the project manager enough detail to review budget movement, and gives the owner a cleaner margin picture than a lump-sum labor total.
The common mistake is mixing base contract work, rework, warranty labor, and approved change work under the same task or cost bucket. Those entries may all involve the same crew and jobsite, but they answer different questions. Base work affects the original budget, rework affects margin, warranty work affects internal cost, and change work may need client billing.
Set up task names or custom labels so cost reports can separate those categories later. A weekly review should answer three questions quickly: which phase consumed the most labor, which work remains uninvoiced, and which tasks are running ahead of the estimate. Blended records force managers to rebuild the answer from comments and memory.
A one-off cost check works when you need to review one project, one week, or one subcontractor's labor category. Export the numbers, compare actual labor against the expected phase budget, and resolve obvious issues before the invoice or payroll review moves forward.
A managed workflow becomes necessary when construction costs feed billing, approvals, budget alerts, and owner reporting every week. Everhour can layer time, rates, budgets, billable status, alerts, and exportable reports onto Asana projects, so approved task time becomes a repeatable cost record instead of a spreadsheet rebuilt after each jobsite update.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Tie labor-heavy costs to Asana tasks when the task explains why the cost exists. Construction examples include site prep, framing, inspections, punch list, warranty work, and change order tasks. Keep general overhead separate unless the project contract requires it on the job record.
Track approved change work in its own task, label, or project section so reports keep it separate from the original contract scope. The record should show the task, date, person, billable status, and description. Mixing change work into base tasks hides recoverable cost and weakens invoice support.
A weekly review works best when each entry has a task, worker, date, duration, rate basis, billable status, and short description. Group reports by phase or task first, then by person when labor ownership matters. That layout shows cost movement without reading every task comment.
The biggest mistake is logging time after the week ends without task-level detail. Late summary entries usually miss the exact work area, billable status, and change order context. Daily task-level entries create a stronger record for budget review, payroll review, and client billing.
Use both when the team needs labor control and client-facing cost review. Project phase shows whether the job is moving through the expected budget. Trade or role grouping shows which crew type is driving cost. The right report keeps both dimensions available without duplicating entries.
Everhour Reporting turns Asana task time, budgets, costs, and project details into customizable reports with columns, grouping, filters, date ranges, and exports. A construction manager can review cost by task, member, client, billable status, or budget metric without rebuilding the report from raw time entries.
Everhour syncs Asana projects and tasks, then lets teams track billable and non-billable time against that work. Approved billable time can flow into invoices, with non-billable work excluded from billable totals while remaining available for project cost reporting.
Track approved task time, rates, budgets, and cost reports on top of Asana projects. Everhour gives construction teams a repeatable cost workflow from field work to billing review.
14-day free trial · No credit card · Cancel anytime