Project spend changes task by task. Everhour keeps Basecamp time, rates, and budget reports connected for review.
Try with my BasecampThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Basecamp to-dos hold the work plan: title, notes, assignee, subtasks, due dates, and completion status. Budget tracking adds the financial layer around that work. The useful outcome is a project review that shows which to-dos consumed time, which lists carried the load, and whether the remaining budget still matches the project plan.
A single to-do usually should not become a separate budget object. Treat it as the evidence behind the project budget. The project holds the hour or money target, while each to-do carries estimates, logged time, task status, and cost detail. That structure keeps the review practical: managers can inspect the exact work item without losing the overall budget picture.
A Basecamp project budget starts with the contract or internal plan. Hourly work needs rates that turn logged time into spend. Fixed-fee work needs a money target that shows how much fee remains after labor and expenses. Non-billable work still needs cost visibility when the team must control internal effort.
Rates need the same care as the budget total. Project rates fit uniform work, member rates fit mixed teams, and custom task rates fit work billed differently from the rest of the project. Mark non-billable tasks deliberately, since non-billable time can still affect labor cost even when it stays out of client billing.
A to-do cost review should connect the task name, list, assignee, status, estimate, logged time, and rate-driven cost. A completed to-do that used 9 hours against a 6-hour estimate tells a different story from an open to-do still accumulating time. The status matters because unfinished work can still consume the remaining budget.
Lists help group the review. Discovery, design, implementation, and revisions often carry different budget risks, even inside the same project. A list-level view shows whether one phase is absorbing the plan while individual to-dos show the exact source. Avoid reading completion status as budget progress; completed tasks can still carry overruns.
A one-off budget check works for a small project, a weekly review, or a quick client question. You need the project target, current logged time, applicable rates, and remaining budget. That snapshot answers one question, but it does not warn anyone while work is still in progress.
A managed workflow fits recurring budgets, shared teams, and projects where overruns need action before month end. Everhour can track Basecamp project budgets in hours or money, apply billable and cost rates, compare estimates with logged time, and send budget emails at admin-configured thresholds such as 50%, 80%, or a custom percentage.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
In this workflow, the budget target belongs to the project, while the to-do supplies the detail behind the budget review. Use to-do estimates, logged time, task status, list names, and cost reporting to see which work items consumed the project budget.
Include to-dos that represent real project work tied to the budget plan. Client deliverables, revision rounds, production tasks, and change-related work should carry time entries. Administrative notes, duplicate placeholders, and discussion-only items should stay out of the cost review unless they represent billable or budgeted work.
Use hours when the main constraint is team capacity or estimated effort. Use money when the project has a fixed fee, client spending cap, or internal cost target. A money budget needs accurate rates, because logged time only becomes cost after the rate rules are applied.
Completion status shows that the work is done, not that the work stayed within plan. A finished to-do can exceed its estimate, use a higher-rate role, or include non-billable labor that reduces margin. Review estimate variance and cost before treating completed work as budget-safe.
Review active project budgets at least weekly, and review them sooner when a large to-do closes, a new phase starts, or a threshold alert fires. Monthly review is too late for fast-moving work because the team has already spent the hours before anyone sees the variance.
Everhour Reporting lets admins build reports with Basecamp project, to-do, list, task ID, task status, budget metrics, labor cost, billable time, and profit columns. Reports can be grouped, filtered, exported to CSV, Excel/XLSX, or PDF, and scheduled for email delivery.
Everhour embeds tracking controls in Basecamp through the browser extension, so team members can log time against Basecamp to-dos while working. The tracked time flows into project budgets, estimates, cost reporting, and threshold alerts without rebuilding the review from separate notes.
Track approved time against Basecamp to-dos, review budget reports by project and list, and use Everhour Reporting to keep cost, remaining budget, and overruns visible.
14-day free trial · No credit card · Cancel anytime