Everhour connects Basecamp project time to reports and project budgets for monthly stakeholder review.
Try with my BasecampThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
A monthly report gives a client, owner, finance lead, or delivery manager one clean view of Basecamp project activity for a closed period. The useful scope is simple: choose the month, include the Basecamp projects that belong in the review, and group the results so the reader can see hours by project, to-do, member, client, and date range.
The report should answer three questions without extra explanation. It shows where time went, which work was billable or non-billable, and whether the month stayed inside the budget or billing model assigned to the project. Basecamp to-dos carry the work context; the report adds time, cost, budget, and billing detail for review.
Project grouping works for a portfolio summary because it shows which Basecamp projects consumed the most time during the month. To-do grouping works when a client or manager needs backup for specific work items. Member grouping works for staffing, approvals, and workload review. Date grouping shows whether effort spiked near a launch, deadline, or review cycle.
Billable and non-billable time belong in the same monthly view when the reader needs the full delivery picture. Removing non-billable work hides internal review, fixes, administration, and client support that affected capacity. A cleaner report keeps both categories visible, then separates billable amount, cost, and non-billable time into columns.
The most common month-end mistake is exporting a flat hour total without enough context to explain it. A report that says 126 hours across three projects still leaves the reviewer asking which to-dos drove the work, which members logged the time, and which entries should affect billing or cost analysis.
Another mistake is mixing open time with reviewed time. Monthly reporting works best after managers approve the period, correct missing entries, and close late edits. A report sent before approval becomes a moving target. Set the review cadence first, then export the final month only after corrections, non-billable task markings, and rate checks are complete.
A one-off spreadsheet is enough when you need a quick internal snapshot for one Basecamp project and the audience accepts manual cleanup. It works for a narrow month-end question, such as member hours for a single project or an archive of filtered time entries.
A managed workflow fits recurring client updates, budget oversight, and leadership reports. Everhour can connect Basecamp projects to hour-based or money-based budgets, fixed-fee or hourly billing setups, non-billable task rules, and automatic budget emails at 50%, 80%, or custom thresholds. Approved time then feeds reports, exports, and cost review without rebuilding the same workbook each month.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Use project breakdowns for portfolio review, to-do breakdowns for delivery detail, member breakdowns for workload and approvals, and date breakdowns for monthly pacing. A client-facing report usually needs project and to-do detail. An internal leadership report usually needs project, member, billable time, non-billable time, cost, and budget columns.
Yes. Non-billable time explains capacity spent on review, rework, administration, support, or internal coordination. Keep it separate from billable time instead of deleting it. That separation protects the client total while still showing the true delivery effort and labor cost for the month.
Use Basecamp projects, lists, and to-dos as the report structure when those are the synced work objects. A clean report should preserve project names, to-do names, section or list names, task IDs, and task status when those fields are available in the reporting layer.
Finalize the report after the month closes and managers approve the time entries for that period. Corrections should happen before export, including missing hours, incorrect billable status, wrong task assignment, and outdated rates. A locked, approved period gives finance and stakeholders a stable record.
CSV works for spreadsheet cleanup, Excel/XLSX works for finance review, and PDF works for a read-only stakeholder summary. Choose the format by audience. A finance reviewer usually needs sortable rows and columns, while a client sponsor usually needs a stable summary with the month, projects, totals, and exceptions.
Everhour Project Budgeting connects Basecamp project time to hour-based or money-based budgets, with one-time or recurring schedules. Admins can set fixed-fee, hourly, or non-billable project rules, include or exclude expenses from fee budgets, and send budget emails at 50%, 80%, or custom thresholds.
Everhour Reporting lets admins build reports with columns, grouping, filters, date ranges, and Basecamp fields such as project, to-do, list, task ID, and task status. Saved reports can be downloaded as CSV, Excel/XLSX, or PDF for spreadsheet work, client sharing, or archive needs.
Connect Basecamp work to Everhour Project Budgeting, review approved time by month, and send recurring budget views with exports that keep client and leadership reporting consistent.
14-day free trial · No credit card · Cancel anytime