Everhour connects tracked task time to monthly reporting for Asana projects, budgets, capacity, and billing review.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
A monthly time report gives you one clean view of task work completed during a calendar month. Use it to review project effort, prepare client billing, compare estimates with actual time, check billable and non-billable work, and spot overloaded team members before the next planning cycle begins.
For Asana projects, the practical source structure is already there: projects, tasks, assignees, statuses, custom fields, and tags. The report becomes useful when logged time, dates, rates, budget context, and approvals stay tied to that same work structure instead of living in disconnected notes or spreadsheet rows.
Start with the month, then define the grouping. A project manager usually needs totals by project, task, and person. A client-facing operations lead often needs billable time, non-billable time, budget remaining, and invoice status. A resource manager needs member totals, planned capacity, time off context, and work that spilled past the expected load.
Use consistent fields before the month closes. Each time entry should connect to the right task, project, logged date, person, and billable status. Comments help explain unusual entries, but they should not carry core reporting data. Put the classification in fields, not in free text.
The most common monthly reporting problem is mixing reviewed and unreviewed time. A report that includes late manual entries, missing billable flags, or unapproved corrections can change after the numbers have already reached finance or a client. Set a cutoff for review, then separate draft numbers from approved month-end totals.
Budget context also needs a clear rule. A monthly time report can show project totals against an hourly, fixed-fee, or non-billable budget, but the comparison only works when the budget method matches how the project is managed. One retainer may need recurring monthly totals, while a delivery project may need cumulative work-to-date totals.
A one-off monthly report is enough when you need a quick internal readout for one project or a single client review. It should show the date range, project names, member totals, task breakdowns, billable status, and export-ready totals without forcing the team into a permanent process.
A managed workflow matters when the same numbers drive billing, payroll review, staffing, and project budgets every month. Everhour keeps time, rates, budgets, approvals, and resource planning connected to Asana work, so tracked hours can feed reports, capacity reviews, and month-end handoff without rebuilding the same report from scratch.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
A complete monthly report should show the reporting period, projects, tasks, team members, logged hours, billable status, non-billable work, budget context, and totals ready for export. Add approvals when the report supports payroll, billing, or finance review. Keep comments as supporting notes, not the main way to classify time.
Use logged dates for the month being reported, then use approval status to decide whether the numbers are final. Approval dates show review progress, but they should not move work into a different month. A time entry logged on June 28 belongs in June, even if a manager approves it on July 2.
Monthly time reports show whether planned work matched actual tracked work by person and project. Compare each member's total hours, assigned work, and time off context before planning the next month. Repeated overload, underuse, or late-month spikes should change future assignments instead of staying hidden in completed task lists.
Missing task links, wrong billable status, late manual entries, duplicate time, and unapproved corrections distort monthly totals. Budget comparisons also fail when a project mixes fixed-fee, hourly, and non-billable work without clear classification. Lock the reporting period after review so regular edits do not change finalized numbers.
Excel export is enough for ad hoc analysis, client backup, or finance archive work. It is not enough as the primary process when the same team closes reports every month, because spreadsheet-only reporting requires repeated cleanup, manual classification checks, and separate approval tracking outside the work record.
Everhour Resource Planning uses visual timelines with member and project views, weekly capacity, availability gaps, scheduled time off, and planned-versus-actual comparisons. That gives managers a month-end view of tracked Asana work and a planning view for the next month in the same workflow.
Everhour Reporting can filter and group tracked Asana time by project, task, member, date range, billing status, budget data, and other synced fields. Saved reports can be exported to Excel/XLSX, CSV, or PDF for client sharing, finance review, or month-end archives.
Review month-end time, capacity, and budget signals in one workflow. Everhour connects Asana task work with resource planning so teams can turn completed hours into better staffing decisions.
14-day free trial · No credit card · Cancel anytime