Everhour tracks time inside Asana tasks so teams can compare planned work, logged hours, and budget impact.
Try with my AsanaThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
A useful task duration record ties time to the Asana task where the work happened, not a loose weekly total. The entry should show the person, date, duration, task, project, and short work description. Categories, approval status, and billable status help managers separate draft time from reviewed time and client-facing time from internal work.
Task duration becomes more useful when it stays connected to estimates. A manager can compare planned time with actual logged time by task, then decide whether the estimate was wrong, the task changed, or the work needs a different owner next time. That review works best when people log time daily instead of reconstructing a week from memory.
Task estimates and logged time answer different questions. The estimate sets the planning target before work starts. Actual time records the duration people spent after the work happened. Mixing the two creates weak project reports because the team loses the difference between planned effort and delivered effort.
A clean workflow keeps estimate changes deliberate. Update the estimate when scope changes, then leave the actual time entries intact. For example, a design task estimated at 4 hours and finished in 6 hours should show both numbers. That gap helps the next project plan, budget review, and client conversation.
Task duration affects project budgets once rates enter the workflow. A project can track hours, money, or both, depending on whether the team needs capacity control, client billing, internal cost review, or fixed-fee protection. Billable and non-billable labels matter because the same hour can affect project cost without becoming invoiceable revenue.
Budget review should focus on the work structure the team uses every day. Keep task titles, project names, custom fields, and tags consistent so reports group time correctly. A vague task name hides the cause of budget drift. A clear task record shows whether planning, scope, rate setup, or late logging caused the overrun.
A one-off task duration check is enough when you need a quick view of one task, one project, or one week. That approach works for spot reviews, estimate cleanup, and simple status conversations where no approval trail, client invoice, or recurring budget limit depends on the result.
A managed workflow becomes necessary when tracked time drives budgets, billing, or staffing decisions. Everhour adds fixed-fee, hourly-rate, and non-billable project budgets to Asana work, with configurable email alert thresholds and reports that show total time, remaining budget, and billable versus non-billable hours.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Task duration means the actual time recorded against a specific Asana task, usually tied to a person, date, project, and work description. The record is strongest when it also carries approval status and billable status, because managers can separate reviewed time from unapproved entries and client-facing work from internal activity.
Use estimates for planning and logged time for actual duration. The estimate tells the team how long the task was expected to take before work started. Logged time shows the duration spent after the work happened. Reports become unreliable when teams overwrite actuals to match estimates or treat estimates as completed work.
Late, vague time entry creates the most common budget problem. A weekly total without task detail hides which work consumed the budget. Daily task-level entries let managers see whether a budget issue came from underestimated work, extra scope, non-billable tasks, or time assigned to the wrong project.
Every task that affects project cost, client billing, capacity, or estimate accuracy should have a duration entry. Tiny administrative tasks can be grouped if the team has a consistent policy. Client work, production tasks, review rounds, and rework need task-level records because they change budgets and future planning.
Billable labels separate time that should appear in client billing from time that stays internal. A non-billable task still counts toward project effort and cost, so it belongs in duration reports. The label decides whether that time contributes to billable amount, not whether the work happened.
Everhour Project Budgeting tracks time and money budgets as people log time on Asana tasks, then shows budget use against fixed-fee, hourly-rate, or non-billable projects. Admins can set configurable email alert thresholds so budget pressure appears before the project reaches its limit.
Everhour syncs Asana project and task data into reports, including project names, task titles, custom fields, and tags. Teams can review task duration with columns for total time, budget remaining, and billable versus non-billable hours, then export detailed reports to Excel.
Track approved task time against budgets before overruns reach the invoice stage. Everhour connects Asana work to budget alerts, billable status, and reports that keep project spending visible.
14-day free trial · No credit card · Cancel anytime