Everhour lets teams track time on Linear issues, then review approved hours, capacity, and reports in Everhour.
Try with my LinearThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
A utilization review gives an engineering lead, delivery manager, or owner a compact answer to one question: where did the team's available time go? For Linear work, issues, projects, assignees, cycles, labels, priority, and status give the work context. Add tracked hours, member capacity context, billable classification, and date range so the review can support delivery, staffing, and client conversations.
Define the measure before you interpret it. One view can focus on total tracked project time, another on billable tracked time, and another on capacity pressure by member. Those views answer different questions, so label each one clearly. A stakeholder update should show the period, the included people, the work grouping, and whether the time is billable, non-billable, or both.
Use the project breakdown when the question is portfolio allocation: which Linear projects consumed the week or month? Use the issue breakdown when a delivery lead needs detail behind a release, incident, or large feature. Use the member breakdown when reviewing capacity pressure, uneven client work, or missing submissions. Use a cycle-matched date range when the team wants the review to follow a Linear time-boxed work period.
Billable and non-billable time belong in the same management view when the goal is team utilization review. Hiding non-billable work makes the workload look cleaner than the schedule felt. A useful report can show billable time, non-billable time, total tracked time, member, project, issue, and date range so the reviewer can separate delivery load from client-chargeable work.
Linear estimates are effort points, not clock time. Tracked hours show the time people actually spent. Treat the estimate as planning context, not as a replacement for a timesheet. A five-point issue and a five-hour task are not the same record unless your team has separately defined and enforced that conversion outside the estimate field.
A common mistake is using issue size as utilization evidence. That turns throughput into a time review and makes people appear available or overloaded based on planning labels rather than logged work. Keep issue status, estimate, assignee, and cycle in the review as work metadata. Use tracked hours and capacity context for the team utilization discussion.
A one-off spreadsheet works when you need a quick weekly summary for a small team: export the period, group hours by project and member, mark billable and non-billable work, and add capacity context for the reviewer. That approach breaks down when the same report gets rebuilt every Friday, different reviewers use different filters, or late edits change the numbers after the update was sent.
A managed workflow fits recurring utilization review. Everhour Team Management supports weekly capacity, approval workflow, roles, project assignments, team groups, lock rules, and admin time correction, so reviewed time can feed recurring reports instead of copied rows. For people outside the tool, export the finished report in CSV, Excel/XLSX, or PDF.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Include tracked project time, billable time, non-billable time, member, project, issue, and date range. Add capacity context when the review covers staffing or workload pressure. Keep billing status visible because a fully scheduled week and a fully billable week are different management signals.
Use member grouping for workload questions, project grouping for portfolio allocation, and issue grouping for delivery detail. A monthly leadership update usually starts with project and member views. A team retrospective can use a cycle-matched date range with issue detail because that connects the time review to work the team recognizes.
Non-billable time should stay visible in the same review before any filtering happens. Internal planning, bug triage, support work, and delivery coordination can explain real capacity pressure even when the time is not client-billable. Split billable and non-billable columns so the report shows both workload and revenue-facing time.
The most common mistake is treating effort points as clock time. Capacity context, estimates, and tracked hours play separate roles. Capacity frames availability, estimates describe planned effort points, and tracked hours record time spent. A review based on issue estimates will not explain where the team's working hours went.
Review team utilization weekly for workload and delivery adjustments, then monthly for staffing, billing, and portfolio trends. Weekly views catch overloaded members and project drift while the work is still current. Monthly views give stakeholders a cleaner summary by project, member, billable status, and date range.
Everhour Team Management supports weekly capacity, approval workflow, roles, project assignments, team groups, lock rules, and admin time correction. Managers can review time under consistent team rules before sharing reports, which reduces confusion from missing submissions, late edits, and mixed access levels.
Everhour Reporting can turn logged time, budgets, costs, and project data into reports with columns, grouping, filters, date ranges, and formatting. Saved reports can be exported as CSV, Excel/XLSX, or PDF, which lets finance, clients, or executives review the summary without working inside the connected project tool.
Use Everhour with Linear to apply capacity, approvals, and team groups before recurring utilization updates leave the team, giving stakeholder reports clearer team management context.
14-day free trial · No credit card · Cancel anytime