Linear hours per issue

Everhour records time on Linear issues so teams can review billable work, cost rates, and weekly totals.

Try with my Linear

Everhour does it all — track, budget, report & invoice

The calculator gives you the number — Everhour takes it from there.

Go ahead — start tracking!

One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.

  • One-click timer — browser, desktop & mobile
  • Works inside Asana, ClickUp, Linear, GitHub & more
  • Simple setup, no learning curve
Works with your favorite tool:
Everhour — Time Tracking
Time Entries
01:24:00
00:31:00
01:07:00

No more budget surprises

Set a budget, assign rates, and get alerted before you're over.

  • Real-time cost tracking
  • Set different rates per person or project
  • Alerts before you hit the budget limit
Everhour — Budgeting
Acme Web Project
1
50% of budget used
$2,500.00of $5,000.00
$2,500.00 remaining
75%
Actual costRemaining cost

Measurement

Track your budget through time or costs

Simple, customizable reports

Every report you need — configured your way, always up to date.

  • See who does what in real time
  • Configure any report
  • Scheduled email reports
Everhour — Reports

Your invoice is ready!

Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.

  • Billable hours straight into the invoice
  • Configure invoice templates
  • Copy invoices to QuickBooks or Xero
  • Invoicing dashboard with status
Everhour — Invoices
Your Company LLChello@yourcompany.com
INVOICE
Invoice #1042
Group by:
DescriptionHoursRateAmount
Website Redesign14h$150/h$2,100.00
Brand Guidelines7h$150/h$1,050.00
Marketing Strategy3.5h$150/h$525.00
Total Due$3,675.00
Try Everhour for real yourself

Issue-based time records for project work

Track issue work by hour

You landed here to see time spent on each Linear issue, not just a broad project total. The practical record starts with the issue itself, then adds the person who worked on it, the date, the duration, and a short note when the entry needs context. That structure lets a manager answer a direct question: which issue produced the hours?

Issue-level tracking works best when every entry stays attached to the issue that caused the work. A developer fixing a bug, a designer reviewing acceptance criteria, and a QA lead retesting the same issue can each log separate time. The issue becomes the common reference point for delivery review, billing review, and team workload analysis.

Capture the right entry details

For a useful review record, capture the Linear issue, project, date, duration, billable status, and note when context is needed. The billable status matters because client-facing time and internal work often sit in the same project history. A note matters when the duration alone does not explain the work, such as investigation, rework, review, or a late handoff.

Manual entries fit completed work that someone forgot to track in real time. A timer fits active work where the person wants the duration captured as the task happens. Teams should use one expectation consistently: start a timer when beginning focused work on an issue, or add a manual entry the same day with enough detail for review.

Read totals at issue level

Issue totals become useful when they separate the work object from the reporting question. One issue can show 2 hours from engineering, 45 minutes from QA, and 30 minutes from review. The total helps a manager compare actual effort against expectations without treating every project hour as equal.

The common mistake is mixing issue-level time with loose project notes. A generic project entry leaves the reviewer guessing which issue consumed the time. That breaks billing detail, makes estimates harder to compare with reported time, and weakens payroll or approval review when a manager needs to confirm the work behind a timesheet.

Move past ad-hoc logging

A one-off entry is enough when you need to record a small amount of time against one issue and export the result for a quick review. That approach stops working when multiple people log time, billable and non-billable work need different treatment, or managers need a durable record before invoicing, payroll review, or project reporting.

Everhour adds the managed layer around Linear issue work: approvals, locked periods, reporting, and billing handoff. Its rate setup separates internal cost rates from client-facing billable rates, supports per-person defaults and per-project overrides, preserves dated rate history, and prices billable work by project, member, or task.

This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.

High Performer

G2

Summer 2026

Best Ease Of Use

Capterra

Summer 2026

Loved by teams. Proven everywhere.

Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.

10K+Teams worldwide
90K+Installs Everhour extension
196M+Tasks completed
4M+Projects tracked

Frequently Asked Questions

Which details should each Linear issue time entry include?

Each entry should identify the issue, project, person, date, duration, billable status, and note when context is needed. The issue ties the time to the work item, while the billable status separates client-chargeable work from internal activity. A same-day entry with a clear note is easier to approve than a late weekly total.

Should a team use timers or manual entries for issue work?

Timers fit focused work that starts and ends around a specific issue. Manual entries fit after-the-fact corrections or short work blocks someone did not time live. A team should define one review rule: manual time needs enough context to explain the issue, date, and duration without a separate follow-up.

Can issue estimates replace logged hours?

Issue estimates and logged hours answer different questions. Estimates describe expected effort or complexity, while logged hours record time actually spent. A manager can compare the two, but one does not replace the other for billing review, payroll review, or a time-based project report.

Which mistake makes per-issue totals unreliable?

Loose project-level entries make per-issue totals unreliable because the hours no longer attach to the issue that produced them. Late backfilling creates the same problem when the person cannot identify the exact issue. Require issue selection at entry time and review uncategorized time before approving the week.

How often should issue hours be reviewed?

A weekly review works for most teams because it catches missing entries before memory fades and before invoices or payroll reports are prepared. Managers should check high-duration entries, missing notes, billable status, and entries posted to the wrong issue. Approved time stays locked for regular members.

How does Everhour price billable Linear issue work?

Everhour separates cost and billable rates so Linear issue time can support labor cost, revenue, and profit reporting. Members can have default rates, projects can override them, and dated rate changes keep older reports tied to the rate that applied when the work happened.

How does Everhour keep Linear issue time ready for review?

Everhour lets managers approve, reject, or partially approve submitted timesheets before reports, payroll review, or billing use the time. Submitted time is locked unless withdrawn or rejected, and approved time stays locked for regular members.

Turn issue hours into billing records

Track approved Linear issue time with Everhour, apply the right cost and billable rates, and carry reviewed hours into reporting and client billing.

14-day free trial · No credit card · Cancel anytime

Or