Linear estimate vs actual hours

Everhour tracks actual task and project hours inside Linear, turning estimated work into reviewable timesheets for teams.

Try with my Linear

Everhour does it all — track, budget, report & invoice

The calculator gives you the number — Everhour takes it from there.

Go ahead — start tracking!

One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.

  • One-click timer — browser, desktop & mobile
  • Works inside Asana, ClickUp, Linear, GitHub & more
  • Simple setup, no learning curve
Works with your favorite tool:
Everhour — Time Tracking
Time Entries
01:24:00
00:31:00
01:07:00

No more budget surprises

Set a budget, assign rates, and get alerted before you're over.

  • Real-time cost tracking
  • Set different rates per person or project
  • Alerts before you hit the budget limit
Everhour — Budgeting
Acme Web Project
1
50% of budget used
$2,500.00of $5,000.00
$2,500.00 remaining
75%
Actual costRemaining cost

Measurement

Track your budget through time or costs

Simple, customizable reports

Every report you need — configured your way, always up to date.

  • See who does what in real time
  • Configure any report
  • Scheduled email reports
Everhour — Reports

Your invoice is ready!

Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.

  • Billable hours straight into the invoice
  • Configure invoice templates
  • Copy invoices to QuickBooks or Xero
  • Invoicing dashboard with status
Everhour — Invoices
Your Company LLChello@yourcompany.com
INVOICE
Invoice #1042
Group by:
DescriptionHoursRateAmount
Website Redesign14h$150/h$2,100.00
Brand Guidelines7h$150/h$1,050.00
Marketing Strategy3.5h$150/h$525.00
Total Due$3,675.00
Try Everhour for real yourself

Turning Linear work into reviewed time records

Build the weekly time record

Create a clean comparison between planned effort and time actually worked on Linear issues. The practical job is a weekly record by person, issue, project, and date, with actual hours separated from estimates on Linear issues. That distinction matters for payroll review, cost reporting, and billing because an estimate describes expected effort, while a time entry records work performed.

A useful week shows each contributor's submitted hours, the Linear issue context, comments for unusual entries, and any missing days that need follow-up. Managers should review the whole week before approval, not just totals by project. A full record answers three questions: who worked, which issue received the time, and whether the submitted hours match the team's working pattern closely enough to approve.

Compare estimates with worked hours

Treat estimates on Linear issues as planning signals, then compare them with tracked hours after work starts. A small issue estimated at 2 points can still require 6 actual hours if investigation, review, or rework expands the task. Focus the review on whether actual time exposes scope growth, unclear requirements, or repeated underestimation.

A manager should review estimate variance at the issue and project level. One overrun may only need a comment. Repeated overruns in the same project, status, or issue type point to a planning habit that needs correction. Actual hours also make cost reporting clearer because rates, budgets, and invoices need worked time, not planning values.

Review before the period closes

The most common mistake is approving a week with clean totals and messy detail. A 40-hour total can still hide missing issue links, duplicate entries, vague comments, or time placed on the wrong project. Review daily distribution, issue assignment, late manual entries, and unusually large blocks before the period closes.

Corrections should happen before approval whenever possible. Submitted time needs a visible review path, and approved time should stop regular members from editing the record later. Admin corrections still need to preserve the reason for the change, especially when the record supports payroll, billing, or project cost analysis. Late edits break confidence because reports no longer match the approved week.

Move from hours to operations

A free comparison is enough when you need one quick check: planned effort beside actual time for a small set of Linear issues. It works for a freelancer, a short internal project, or a manager preparing a single meeting. The limit appears when several people submit time, corrections arrive after review, or accounting needs a stable export.

A managed workflow turns collected hours into an operating record. Everhour adds timers and manual entries inside Linear, then routes hours through timesheet submission, approval, locked periods, admin corrections, exports, and reports. That workflow gives managers a reviewed source for payroll, billing, project cost, and budget conversations instead of a spreadsheet that changes after decisions are made.

This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.

High Performer

G2

Summer 2026

Best Ease Of Use

Capterra

Summer 2026

Loved by teams. Proven everywhere.

Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.

10K+Teams worldwide
90K+Installs Everhour extension
196M+Tasks completed
4M+Projects tracked

Frequently Asked Questions

Should estimates on Linear issues be treated as actual hours?

No. Estimates on Linear issues are planning inputs, while actual hours are records of time worked. Keep them separate in review. Use estimates to spot variance and improve planning, then use submitted time entries for payroll review, cost reporting, billing, and budget analysis.

Which variance should a manager review first?

Start with large actual-hour overruns on active or recently completed issues, then check entries with missing comments, late manual additions, or time logged to the wrong project. A small variance with a clear reason needs less attention than a repeated pattern across the same project, contributor, or issue type.

How should weekly Linear issue time be approved?

Review the week by person, project, issue, and day before approval. Confirm that each entry has the right Linear issue context and that unusual totals have comments. Approve the week only after missing entries, duplicate time, and wrong-project logs are corrected.

Why do locked periods matter after timesheet approval?

Locked periods protect the reviewed record. After approval, regular members should not be able to change entries that already fed payroll, billing, or cost reports. Admin corrections can still happen when needed, but the correction should leave enough context to explain why the approved record changed.

What is the biggest mistake in estimate versus actual review?

The biggest mistake is comparing totals without checking the underlying entries. A project can look close to plan while individual issues contain missing time, duplicated time, or work logged under the wrong person. Issue-level review catches those problems before the numbers feed reports.

How does Everhour Time Tracking capture actual hours for Linear work?

Everhour Time Tracking lets contributors use timers or manual entries on Linear tasks and projects, then sends those hours into timesheets, reports, budgets, invoices, and payroll review. Admins can use approvals, locked periods, reminders, and timer rules to control the review cycle.

How does Everhour keep Linear time data usable for reports?

Everhour syncs Linear workspace, project, issue, status, and tag data into reports, so managers can group actual hours by the same work context the team uses. Reports can then support project cost review, billing checks, and team time analysis.

Turn Linear hours into approved records

Track actual hours on Linear work, approve weekly timesheets, lock reviewed periods, and export clean records with Everhour Time Tracking.

14-day free trial · No credit card · Cancel anytime

Or