Linear cycle time estimates

Everhour connects tracked time on Linear issues to reports, giving cycle planning a clean estimate-versus-actual review.

Try with my Linear

Everhour does it all — track, budget, report & invoice

The calculator gives you the number — Everhour takes it from there.

Go ahead — start tracking!

One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.

  • One-click timer — browser, desktop & mobile
  • Works inside Asana, ClickUp, Linear, GitHub & more
  • Simple setup, no learning curve
Works with your favorite tool:
Everhour — Time Tracking
Time Entries
01:24:00
00:31:00
01:07:00

No more budget surprises

Set a budget, assign rates, and get alerted before you're over.

  • Real-time cost tracking
  • Set different rates per person or project
  • Alerts before you hit the budget limit
Everhour — Budgeting
Acme Web Project
1
50% of budget used
$2,500.00of $5,000.00
$2,500.00 remaining
75%
Actual costRemaining cost

Measurement

Track your budget through time or costs

Simple, customizable reports

Every report you need — configured your way, always up to date.

  • See who does what in real time
  • Configure any report
  • Scheduled email reports
Everhour — Reports

Your invoice is ready!

Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.

  • Billable hours straight into the invoice
  • Configure invoice templates
  • Copy invoices to QuickBooks or Xero
  • Invoicing dashboard with status
Everhour — Invoices
Your Company LLChello@yourcompany.com
INVOICE
Invoice #1042
Group by:
DescriptionHoursRateAmount
Website Redesign14h$150/h$2,100.00
Brand Guidelines7h$150/h$1,050.00
Marketing Strategy3.5h$150/h$525.00
Total Due$3,675.00
Try Everhour for real yourself

Planning issue effort against recorded work

Set up the estimate review

Start with the issue title, assignee, project, cycle date range, status, labels, and the Linear effort-point estimate assigned to the issue. The finished review should show that estimate separately from the time actually logged, so the owner can see whether the issue was scoped tightly, left untracked, or mixed with unrelated work.

Cycle-level review works best after the team separates two measures: the planning signal and the work record. The planning signal is the Linear estimate on the issue, using the team's selected effort scale. The work record comes from timers or manual entries tied to the same issue while work happens. A clean review keeps both values visible, then adds a short reason for the gap, such as under-scoped QA, unexpected dependency, or missing time entry.

Build the comparison fields

A useful issue comparison needs a consistent set of fields. Capture the Linear issue, project, assignee, cycle date range, status, labels, effort-point estimate, logged hours, and variance note. Add the cause because a large gap has different meaning when the estimate missed review work than when the person forgot to log time. Keep the unit label visible so points, dates, and hours do not collapse into one number.

Use the same review order every cycle. First, compare finished issues because their actual hours are complete. Next, flag in-progress issues separately since partial work makes the record noisy. Finally, group results by project, assignee, or label when that grouping changes the decision. Several issues with the same label and repeated overages point to a planning pattern; one blocked issue points to a workflow exception.

Read variance without guessing

Variance is useful only after you name the cause. Logged hours far above a small effort-point estimate can mean under-scoped work, late discovery, rework, or a missing split into smaller issues. Logged hours far below a larger estimate can mean efficient execution, inflated planning, or unrecorded time. Use each variance note as a planning input. Apply performance review criteria only under an explicit team policy.

Cycle dates add another layer. A deadline says when work must finish; an effort-point estimate expresses expected size on the team's scale. Keep those ideas distinct during review. An issue can miss a date with low logged hours because it waited on dependency input, and an issue can finish on time with high logged hours because the team absorbed hidden work. Record both outcomes instead of averaging them away.

Move from one review to history

A one-off review is enough when one team needs a quick check after a single cycle. Enter the Linear effort-point estimates, gather the logged hours, sort the largest gaps, and decide which estimates deserve adjustment next time. This level works for a small project, a short retrospective, or a manager who needs a single export for discussion.

A managed workflow matters once estimate accuracy becomes a track record. Everhour's Linear integration can place timers and manual logging on issues, sync workspace, project, issue, status, and tag data, and feed customizable reports with 45+ columns, grouping, filters, date ranges, and CSV, Excel/XLSX, or PDF exports. That history turns scattered cycle reviews into evidence for future budgets and planning.

This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.

High Performer

G2

Summer 2026

Best Ease Of Use

Capterra

Summer 2026

Loved by teams. Proven everywhere.

Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.

10K+Teams worldwide
90K+Installs Everhour extension
196M+Tasks completed
4M+Projects tracked

Frequently Asked Questions

How should a team compare Linear estimates with actual hours?

Use one row per issue and keep the Linear effort-point estimate, logged hours, cycle date range, status, assignee, and variance note in separate fields. Review completed issues first, then label the reason for each large gap. The reason matters more than the raw difference because under-scoped work, scope changes, and missing time entries lead to different fixes.

Should cycle estimates use points or hours?

Linear estimates are effort-point values on the team's selected scale, not clock time. Logged hours measure time actually spent. Keep both units separate in the review, and avoid treating a point estimate as a native hour estimate unless the team maintains a documented external rule for that comparison.

Which issues belong in the cycle review?

Include issues assigned to the cycle date range that need an estimate accuracy check, especially completed work and high-gap in-progress work. Exclude backlog placeholders, duplicated issues, and work with no owner until someone confirms the scope. A review covering every half-formed item creates noise and hides the estimates that actually changed delivery.

How should missing time affect estimate accuracy?

Missing time should pause the accuracy judgment for that issue. A variance review compares a planning signal with a work record, so incomplete logging makes the actual side unreliable. Ask the owner to add the missing entry or mark the row as incomplete. Treating blank time as efficient delivery teaches the next plan the wrong lesson.

How do cycle dates change the estimate review?

Cycle dates define the review window. The effort estimate stays separate. Compare logged hours from the same date range as the cycle, then note issues that started earlier, finished later, or paused between days. That note protects the review from blaming an estimate for calendar delay, dependency waiting, or carryover work.

How does Everhour Reporting support estimate reviews for Linear work?

Everhour Reporting supports customizable reports with 45+ columns, grouping, metadata filters, and date ranges. For Linear work, synced project, issue, status, and tag data can sit beside tracked time and issue estimates, with CSV, Excel/XLSX, or PDF exports for review.

How can Everhour keep Linear issue hours current during the cycle?

Everhour Time Tracking adds timer and manual entry controls inside supported project tools, including Linear through the browser extension. Team members record time on the issue as work happens or add a past entry later, giving the report a clearer actual-hours record before review.

Turn reviews into planning evidence

Use Everhour Reporting to review tracked hours beside estimates on Linear issues, group results by project, issue status, or tag, and export evidence that improves future budgets.