Everhour puts timers inside Jira issues, giving teams cleaner project hours, budgets, and worklog records.
Enter your time in and out for each day. Overtime and gross pay are calculated automatically.
| Day | Time In | Break Start | Break End | Break | Time Out | Total |
|---|
The calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Use this page when your team needs to record time against Jira issues instead of copying hours into a separate sheet at the end of the week. The useful output is a set of issue-level time entries tied to projects, epics, statuses, labels, and assignees. Developers, QA, product managers, and agency leads can then review work by feature, sprint, client, or support queue without losing the issue context.
For U.S. payroll use, the record still has to support wage-and-hour review outside Jira. The FLSA lets covered employers choose any complete and accurate timekeeping method, but records for employees covered by the FLSA minimum wage or overtime provisions must include hours worked each workday and total hours worked each workweek. Jira issue logs can support that record only if daily entries and weekly totals stay complete.
A usable Jira time record starts with the issue, the person, the date, the amount of time, and a short work note. The project, parent epic, issue number, status, labels, and custom fields give the entry its reporting context. Jira Cloud accepts estimates and logged time in weeks, days, hours, and minutes. A bare number uses the Jira admin's default time unit, so teams should standardize entry habits before reports are compared.
A practical entry for a billing review reads like: April 9, 2026, PROJ-142, QA regression on checkout error, 1.5 hours, billable, Sprint 18, Checkout epic. The note explains the work without turning the worklog into a diary. Keep client billing labels, internal cost codes, and nonbillable categories separate so one issue can support velocity, budget, and invoice review.
Jira permissions decide who can log and change time. Users need Browse spaces and Work on work items permissions to log time in Jira Cloud, and separate edit or delete permissions control changes to own or all worklogs. Removing access to a project should stop new tracking there, while historical records need to remain available for reporting and payroll review.
Treat Jira as the source of work context and your time system as the source of reviewed hours. Sync gaps appear when teams mix direct Jira logging, add-on logging, spreadsheets, and copied notes without one rule for the final record. Comments also need discipline: long explanations, formatting, and emojis can break clean worklog exports because some synced worklog comments are limited to 1,000 characters.
A one-off tracker is enough for a freelancer, a small cleanup project, or a short audit of Jira issue time. Use it to create a clean timesheet, reconcile a sprint, or summarize hours before sending a simple invoice. It works best when one person controls the entries, rates rarely change, and the record does not need formal approval or recurring budget review.
A managed workflow belongs in teams that bill from Jira work, run retainers, or compare actual hours with project budgets. Everhour Project Budgeting tracks time and money budgets as issue work is logged, supports recurring budget periods, sends threshold email alerts, and can stop timers or block extra logging after a budget is exceeded. That creates a budget trail before invoices, payroll review, or client status meetings.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Log time on the issue that represents the actual work, not only on an epic or parent item. Issue-level entries keep the project, task number, status, labels, and custom fields attached to the time record. Parent or epic rollups then summarize the work without hiding where the hours came from.
Jira Cloud users need Browse spaces and Work on work items permissions to log time. Editing or deleting worklogs requires separate permissions for own worklogs or all worklogs. A permission cleanup should remove new tracking access while preserving historical time records needed for reporting, billing, or payroll review.
Use matching units for estimates and logged time if reports compare planned and actual work. Jira Cloud accepts weeks, days, hours, and minutes, and a number without a unit uses the Jira admin's default. Teams that mix 1, 1 hour, and 1 day create avoidable cleanup before sprint or budget reporting.
Jira issue logs can support U.S. records if the employer keeps a complete and accurate record, including hours worked each workday and total hours worked each workweek for employees covered by the FLSA minimum wage or overtime provisions. Payroll still needs the employee's fixed 168-hour workweek because, unless exempt, covered employees must receive FLSA overtime at not less than 1.5 times the regular rate for hours worked over 40 in that workweek.
Comments should be short enough to survive exports and readable enough to explain the work later. A safe note names the deliverable, blocker, or review result, then excludes sensitive employee or customer details. Some synced Jira worklog comments have a 1,000-character limit, and formatting or emojis can be lost.
Everhour Project Budgeting tracks time and money budgets as teams log issue time, with recurring budget periods and threshold email alerts at 75%, 90%, 100%, or custom levels. Budget protection can stop timers and prevent extra logging after the budget is exceeded.
Everhour's Jira Cloud integration can write Everhour-created entries to Jira native worklogs when worklog sync is enabled, so Jira reports and issue history can use them. New time entered directly in Jira does not sync back into Everhour, so teams need one entry rule.
Connect Jira issue work to Everhour Project Budgeting for recurring time or money budgets, threshold alerts, and budget protection that keeps billable Jira projects under control.
14-day free trial · No credit card · Cancel anytime