Linear estimate points to hours

Linear issues carry the plan, and Everhour connects those estimates to tracked hours for clearer variance reviews.

Try with my Linear

Everhour does it all — track, budget, report & invoice

The calculator gives you the number — Everhour takes it from there.

Go ahead — start tracking!

One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.

  • One-click timer — browser, desktop & mobile
  • Works inside Asana, ClickUp, Linear, GitHub & more
  • Simple setup, no learning curve
Works with your favorite tool:
Everhour — Time Tracking
Time Entries
01:24:00
00:31:00
01:07:00

No more budget surprises

Set a budget, assign rates, and get alerted before you're over.

  • Real-time cost tracking
  • Set different rates per person or project
  • Alerts before you hit the budget limit
Everhour — Budgeting
Acme Web Project
1
50% of budget used
$2,500.00of $5,000.00
$2,500.00 remaining
75%
Actual costRemaining cost

Measurement

Track your budget through time or costs

Simple, customizable reports

Every report you need — configured your way, always up to date.

  • See who does what in real time
  • Configure any report
  • Scheduled email reports
Everhour — Reports

Your invoice is ready!

Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.

  • Billable hours straight into the invoice
  • Configure invoice templates
  • Copy invoices to QuickBooks or Xero
  • Invoicing dashboard with status
Everhour — Invoices
Your Company LLChello@yourcompany.com
INVOICE
Invoice #1042
Group by:
DescriptionHoursRateAmount
Website Redesign14h$150/h$2,100.00
Brand Guidelines7h$150/h$1,050.00
Marketing Strategy3.5h$150/h$525.00
Total Due$3,675.00
Try Everhour for real yourself

Turning issue estimates into hour records

Plan issue work in points

Use this page when a Linear issue already has an estimate and you need to translate that planning signal into an hours conversation. Linear estimates are effort or size values, depending on the team's scale: Exponential, Fibonacci, Linear, or T-Shirt. Those values support scope planning, but they do not equal clock time by themselves.

A useful review starts with the issue's team, project, assignee, status, labels, cycle, and estimate. Keep the point value visible, then attach actual tracked hours to the same issue context. A 5-point issue and a 12-hour result are two different facts: one describes expected effort, the other records time actually spent.

Separate points from hours

Points work best as relative size. Hours work best as measured duration, billing input, and cost input. Treating 1 point as a fixed number of hours too early creates false precision, especially when one 3-point issue contains discovery work and another 3-point issue contains familiar implementation.

Build the comparison after work finishes. Review estimated effort points beside tracked hours, then ask whether the variance came from under-scoped work, interrupted execution, unclear acceptance criteria, or missing time records. The same point value can produce different hour totals across projects, so the review needs issue-level context rather than a universal conversion table.

Read variance before converting

A point-to-hours review needs the issue estimate, the final status, the assignee, the date range, and the logged time. Add comments when the hour total looks unusual. A short note such as "API dependency changed scope after review" explains why a planned 3-point issue consumed more time than similar work.

Use cycle windows as review periods, not as proof that every issue inside the window followed the same pattern. Compare work completed during the cycle date range with the issue estimates and tracked hours attached to those issues. Large overruns deserve a scope note; large underruns deserve a check for unrecorded time before the team treats the estimate as accurate.

Move from guesswork to evidence

A one-off comparison is enough when you need to inspect one issue, explain a variance in a retro, or clean up a project review. It gives the team a concrete read on whether the estimate held and whether the time record is complete enough to trust.

A managed workflow becomes necessary when estimates vs. actuals inform budgets, staffing, and client conversations. Everhour can sync Linear projects and issues, capture timer or manual entries from inside Linear through the browser extension, and carry those hours into customizable reports with grouping, filters, date ranges, and export formats for recurring review.

This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.

High Performer

G2

Summer 2026

Best Ease Of Use

Capterra

Summer 2026

Loved by teams. Proven everywhere.

Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.

10K+Teams worldwide
90K+Installs Everhour extension
196M+Tasks completed
4M+Projects tracked

Frequently Asked Questions

Can Linear estimate points be converted into hours?

Linear estimate points can be compared with hours, but they should not be treated as a fixed conversion unless your team has defined and tested that rule. Linear estimate values represent effort or size. Tracked hours represent time actually spent. A better practice is to review completed issues and build a historical range for similar work.

Which estimate scale works best for hour reviews?

The best scale is the one your team applies consistently. Linear supports Exponential, Fibonacci, Linear, and T-Shirt estimate scales. Hour reviews become useful when the same team uses the same scale across similar issues, then compares completed issue points with tracked hours over a defined date range.

What causes a point estimate to miss the actual hours?

A point estimate misses actual hours when the issue scope changes, acceptance criteria stay unclear, work waits on outside dependencies, or time entries are incomplete. Separate those causes during review. Under-scoped work changes future planning. Missing time records require timesheet cleanup before the estimate history can guide the next plan.

Should points and hours appear in the same report?

Points and hours should appear together when the report is used for planning review, budget explanation, or estimate accuracy. Keep the columns separate. A report that shows issue, estimate, assignee, status, logged hours, and variance lets the team learn from completed work without pretending that points and hours measure the same thing.

How should sprint or cycle planning use past hour data?

Past hour data should inform the next planning window by showing how many actual hours similar estimated issues consumed. Use the cycle or sprint dates as the review range, then inspect completed issues inside that period. Keep dates and effort separate: a deadline shows timing pressure, while tracked hours show labor spent.

How does Everhour Reporting help compare Linear estimates with actual hours?

Everhour Reporting can turn synced Linear project and issue data, tracked time, date ranges, filters, grouping, and custom columns into estimate-vs-actual reports. Teams can export reports as CSV, Excel/XLSX, or PDF when the review needs a spreadsheet, client file, or project archive.

How does Everhour capture hours on Linear issues?

Everhour embeds timer and manual time-entry controls in Linear through its browser extension. Team members can log time against the issue they are working on, while synced Linear workspace, project, issue, status, and tag data stays available for reports.

Build better estimate reviews

Compare Linear issue estimates with tracked hours in Everhour, then turn variance into reports that improve future budgets, staffing decisions, and planning accuracy.

14-day free trial · No credit card · Cancel anytime

Or