Linear engineering time management

Engineering load changes weekly across Linear projects, and Everhour keeps capacity, assignments, and tracked hours ready for review.

Try with my Linear

Everhour does it all — track, budget, report & invoice

The calculator gives you the number — Everhour takes it from there.

Go ahead — start tracking!

One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.

  • One-click timer — browser, desktop & mobile
  • Works inside Asana, ClickUp, Linear, GitHub & more
  • Simple setup, no learning curve
Works with your favorite tool:
Everhour — Time Tracking
Time Entries
01:24:00
00:31:00
01:07:00

No more budget surprises

Set a budget, assign rates, and get alerted before you're over.

  • Real-time cost tracking
  • Set different rates per person or project
  • Alerts before you hit the budget limit
Everhour — Budgeting
Acme Web Project
1
50% of budget used
$2,500.00of $5,000.00
$2,500.00 remaining
75%
Actual costRemaining cost

Measurement

Track your budget through time or costs

Simple, customizable reports

Every report you need — configured your way, always up to date.

  • See who does what in real time
  • Configure any report
  • Scheduled email reports
Everhour — Reports

Your invoice is ready!

Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.

  • Billable hours straight into the invoice
  • Configure invoice templates
  • Copy invoices to QuickBooks or Xero
  • Invoicing dashboard with status
Everhour — Invoices
Your Company LLChello@yourcompany.com
INVOICE
Invoice #1042
Group by:
DescriptionHoursRateAmount
Website Redesign14h$150/h$2,100.00
Brand Guidelines7h$150/h$1,050.00
Marketing Strategy3.5h$150/h$525.00
Total Due$3,675.00
Try Everhour for real yourself

Planning engineering time across Linear work

Start with the next assignment

Decide who can take the next piece of engineering work across Linear projects. Each person has a weekly capacity, each issue or project assignment consumes part of it, and the manager needs to see whether planned work fits before committing more work.

Keep the decision close to the work record. Linear holds the issue, project, assignee, status, priority, labels, estimate value, and cycle context. Capacity planning adds a time view on top: assigned hours, remaining availability, scheduled time off, and actual tracked hours after the work starts.

Separate points from hours

Linear estimate values describe effort or size, using team-level scales such as Exponential, Fibonacci, Linear, or T-Shirt. Treat those values as planning signals for scope and sequencing. They do not become hours by default, and a fixed point-to-hour conversion creates false precision when issue complexity changes.

Use hour estimates only when you need a workload decision. A 5-point issue can still need 6 planned hours for one engineer and 14 hours for another if the work includes unfamiliar code, review, testing, or coordination. Capacity planning works best when planned hours are written as the expected time commitment for the assigned person.

Build a weekly workload view

A useful workload view starts with each person's available hours for the week, then subtracts assigned work by project or issue. The same person can look available in one project view and overloaded across all projects, so assignment review needs a person-level total before the team adds more work.

Check the shape of the load, not just the total. Ten planned hours on one urgent issue differs from ten hours spread across small interruptions. Include known absences, project commitments, and review work before treating remaining capacity as open time. Utilization needs a clear definition, such as planned project hours divided by available hours, before anyone acts on the ratio.

Move from snapshot to system

A one-off capacity snapshot is enough when you need a quick assignment check for the week. It works for a small team, a short project, or a single planning meeting where the only decision is whether one person can absorb one more issue.

A managed workflow matters when assignments, tracked hours, and corrections need to stay accurate project by project. Everhour Team Management supports weekly capacity per member, project assignments, personal tracking limits, time approval, lock rules, and admin time correction, so planned load can be checked against actual tracked work instead of a stale spreadsheet.

This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.

High Performer

G2

Summer 2026

Best Ease Of Use

Capterra

Summer 2026

Loved by teams. Proven everywhere.

Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.

10K+Teams worldwide
90K+Installs Everhour extension
196M+Tasks completed
4M+Projects tracked

Frequently Asked Questions

How should engineering managers compare assigned load with capacity?

Start with available hours for each person, then subtract planned work assigned across Linear projects and issues. The useful signal is remaining availability after all active commitments, not a single project's staffing view. Scheduled time off and part-time capacity belong in the same review because they change the hours a person can actually commit.

Should Linear estimate values be used for workload balancing?

Use estimate values as effort signals, then plan workload in hours when assignment capacity is the decision. Linear estimate scales describe size or effort, not a native clock-time amount. A team can keep points for scope discussions and still assign planned hours for staffing, scheduling, and overload review.

Which workload mistake causes overload to stay hidden?

Project-by-project review hides overload when the same person has assignments in several places. A manager needs a person-level weekly total across projects before adding work. The common mistake is checking whether one issue fits while ignoring review duties, carryover work, and already assigned time elsewhere.

How should tracked hours change the next plan?

Tracked hours give the next capacity plan a reality check. If one category of issue regularly uses more time than planned, raise future hour estimates or reduce parallel assignments for that person. If tracked time consistently comes in lower, the team can tighten estimates without changing the issue-flow data used for scope review.

How should utilization be defined for engineering workload?

Define utilization before using the number. Billable-to-available time measures revenue coverage, while planned-project-hours-to-available-hours measures assigned workload. A busy engineer can have high assigned workload and low billable utilization if the work is internal, support-heavy, or non-billable.

How does Everhour Team Management support Linear engineering capacity?

Everhour Team Management lets admins set weekly capacity per team member, assign people to projects, apply personal tracking limits, and approve or reject time before reports use it. That keeps Linear project work tied to a controlled time record for workload review.

How does Everhour show planned work against tracked time?

Everhour Resource Planning uses member and project timeline views, weekly capacity, time off, and planned-versus-actual comparisons. Managers can see upcoming availability, capacity gaps, and overallocated people, then compare the plan with tracked time as work moves through Linear projects.

Manage engineering time with Everhour

Track capacity, assignments, and approved hours in one workflow connected to Linear projects. Everhour Team Management keeps workload decisions tied to controlled time records and weekly capacity.

14-day free trial · No credit card · Cancel anytime