Everhour adds timesheet approval and workload reporting to ClickUp task work, so managers can compare availability with actual hours.
Try with my ClickUpThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Use this page when your team organizes tasks in ClickUp and needs a clearer view of who can take the next assignment. The practical job is to compare each person's weekly capacity with committed work across projects, then spot the weeks where planned work exceeds available time before the schedule breaks.
A useful capacity view separates assignment from completion. A task can sit with the right assignee and status while still creating too much load for that person's week. Track planned hours by person, keep project context attached, and review total commitment before assigning more work.
A workable capacity plan needs three inputs: each person's weekly availability, the planned hours assigned to that person, and the project or task those hours belong to. ClickUp provides the task structure and project context. Everhour adds planning controls for task time, estimates, budgets, and timesheets.
Treat weekly capacity as the ceiling for planned work, not a target to fill automatically. Time off, part-time schedules, and existing project commitments reduce available hours. A person with 40 weekly hours and 34 assigned hours has 6 hours of visible space only if no absence, meeting load, or non-project work changes that week.
Over-capacity signals need action before the week starts. A planner should show whose assigned hours exceed weekly availability, which project created the excess, and whether the overload comes from one large task or several small commitments spread across clients. That distinction changes the fix.
The cleanest correction is specific: move one task, reduce scope, extend the due date, or split the work across another available person. Avoid averaging overload across the team. Five people with spare time do not help if the blocked skill, project access, or client context sits with one overassigned person.
A one-off capacity check is enough for a small schedule decision, such as assigning one task this week or checking whether a project owner has room for a handoff. It becomes weak when managers need recurring workload review, approved time records, billing context, or a reliable history of planned versus actual hours.
Everhour turns the snapshot into a managed workflow by pairing ClickUp task work with weekly timesheets, approvals, and locked records. Planned load can be checked against tracked hours project by project, so future capacity decisions reflect actual work patterns instead of last week's assignment board.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Set weekly capacity by person before assigning planned hours. Use the person's actual working availability for that week, then subtract scheduled time off or known non-project commitments. The capacity number should represent available work time, not a full-time default applied to everyone.
Review assigned planned hours against the person's weekly availability. A status view shows where work sits, but the capacity decision needs the total load across ClickUp projects. The next task should go to someone with available hours and the right project context.
Tracked time shows whether planned work matched actual effort. A task estimated at 6 hours but repeatedly taking 10 hours reduces future availability more than the original plan showed. Use actual tracked hours to adjust estimates, staffing, and due dates before the same pattern repeats.
Reviewing each project separately hides overload across the full week. A person can look available inside one ClickUp project while carrying commitments in two others. Capacity tracking needs a person-level view across projects so the total assigned load is visible.
Utilization needs a clear definition before use. Billable-to-available utilization measures billable tracked time against available capacity. Workload measures assigned or planned hours against availability. A person can be fully loaded with non-billable project work while showing lower billable utilization.
Everhour Timesheets collect weekly project hours and working hours by person, then let users submit time for manager review. Managers can approve, reject, partially approve, and lock entries, giving capacity reviews a checked record before billing, payroll review, or future planning uses the time.
Everhour embeds timer and manual time controls inside ClickUp through the browser extension and syncs ClickUp task and project structure into Everhour reporting. Teams can plan work around ClickUp tasks while tracked time feeds Everhour records for workload review.
Use Everhour timesheets with ClickUp project work, compare planned load with actual time, and make future capacity decisions easier to defend.