Everhour records time from ClickUp tasks in timesheets so managers can compare planned work with reviewed hours.
Try with my ClickUpThe calculator gives you the number — Everhour takes it from there.
One click and you're timing. Start a timer, add an entry, edit the details. This is exactly how it feels in Everhour.
Set a budget, assign rates, and get alerted before you're over.
Measurement
Track your budget through time or costs
Every report you need — configured your way, always up to date.
Tracked hours flow straight into a polished invoice — no copy-paste, no manual math.
Use a Space as the planning boundary when the same people carry work across several Lists, Folders, clients, or internal streams. The practical question is simple: who has enough weekly availability to take the next task without pushing current commitments past capacity? Keep the ClickUp hierarchy visible for Space, Folder, List, task, and subtask context, then review the workload by person before adding more work.
For each person, compare remaining weekly capacity with assigned planned hours and active work already in progress. A Space-level plan should avoid task counts as the main signal because one short task and one multi-day task do not carry the same load. Use hours, dates, owners, and task context so the next staffing decision reflects the actual commitment behind each assignment.
A usable load view needs one row per person for the week and one assignment record for every planned block of work. Each assignment needs the task or project, owner, planned period, and total or per-day hours. Everhour Resource Planning supports assignments for a project or task, a client, or time off, which keeps capacity and absences in the same weekly review.
Daily planned time should come from the assignment estimate divided across the assigned days. That prevents a task scheduled from Monday through Friday from looking like a single-day load. Review planned hours against the remaining weekly capacity after scheduled time off, then mark over-capacity assignments for rescheduling, scope reduction, or reassignment before the week starts.
False capacity appears when a Space review looks at one List at a time while the same person also carries work in another List or Folder. Group the workload by person first, then inspect the underlying project, task, and status details. A single clean-looking slice hides overload when other active assignments sit elsewhere in the Space.
Time off reduces the available base. A part-time person, a holiday, or a planned sick day lowers the capacity that assignments can consume. Scheduled time off should appear on the resource timeline so assignments account for absences. Over-capacity signals require action before the deadline. A note after a missed window does not fix the schedule.
A one-off workload snapshot is enough when you need a quick staffing read for a small Space, a single week, or a short client request. It gives the answer the assignment decision needs: who is available, who is already committed, and which work sits above remaining weekly capacity. Record that snapshot when the decision needs a trail.
A managed workflow becomes necessary when planned load needs to stay connected to tracked reality project by project. Everhour embeds timers in ClickUp tasks through the browser extension, records added or edited time into Everhour timesheets, and lets teams compare planned capacity with actual tracked time. Submitted time is locked unless withdrawn or rejected, and approved time stays locked for regular members.
This content is for general information only, may not be fully up to date, and is provided without any warranty or liability.
High Performer
G2
Summer 2026
Best Ease Of Use
Capterra
Summer 2026
Rated in the top time trackers across G2, Capterra, and TrustRadius — with consistent praise for ease of use, integrations, and support.
Structure the plan around people first and tasks second. For each person, list weekly capacity, scheduled time off, remaining capacity, active assignments, planned hours, and the task or project each block belongs to. Keep Lists and Folders visible as context and judge the week by assigned load against remaining availability.
The clearest signal is planned assignment hours exceeding the remaining weekly capacity after scheduled time off. Task count is weaker because assignment size varies. A person with three small tasks can have room, while one large task can consume the week. Reassign, split, defer, or reduce scope before assigning the next task.
Define utilization before using the number. For capacity planning, use planned assigned hours divided by available weekly capacity. For billing analysis, use billable hours divided by available capacity. Mixing the two turns a busy non-billable week into the wrong staffing signal.
Reviewing each List separately hides overload when the same person has active work across several Lists or Folders. Review the Space by person, then inspect task, List, Folder, status, and date details. Subtract scheduled time off before judging availability so absences reduce the weekly base.
Tracked hours show whether the estimate matched the work. A task planned at 6 hours and tracked at 10 hours should change the remaining schedule, the next estimate, or the assignee's open capacity. Repeated overruns belong in the next assignment decision across the Space.
Everhour Timesheets collect weekly project hours and working hours for people tracking work on ClickUp tasks. Team members submit the week for review, then admins approve, reject, partially approve, and lock time entries so staffing, billing, and payroll review use reviewed hours.
Everhour Resource Planning shows assignments on a visual timeline with member and project views. Weekly capacity, time off, and planned work sit together, and the weekly summary highlights people scheduled beyond capacity so managers can adjust the ClickUp assignment before work starts.
Use Everhour Timesheets to collect weekly project and working hours from ClickUp work, approve or reject submitted time, and lock reviewed entries for cleaner staffing, billing, and payroll review.